Great Plains 2420P Assembly Instructions User Manual

Page 4

Advertising
background image

120-299M

4/8/2004

Great Plains Mfg., Inc.

Veris Drive Option

4

Refer to Figure 6

10. Loosen the lock collar on the line shaft

sprocket and pull each line shaft out until the
shaft allows access between the two openers
below the sprockets installed in step 5. Slide
each 36 tooth sprocket and lock collar onto
the shaft and return the shaft to its original po-
sition.

Note: For 7 1/2" spacing, slide the 36 tooth
sprocket tight against the bearing and lock the col-
lar in place with set screws.

For 10" and 15" spacing align the 36 tooth sprock-
et with the sprocket above it, and hold in place
with a lock collar on each side.

Important: Remember to retighten the lock col-
lars at the end of the drill.

Refer to Figure 7

11. Install both drive chains and tighten with the

idler on the front side of chain.

Refer to Figure 8

12. Install the control module on the top tube of 3-

point mainframe using 1/2” x 3" x 4" U-bolts.
Locate the module so that the inside U-bolt
measures 54 3/4" from the center of the frame
on 15’ drills and 68 1/4" on 20’ and 24’ drills.

Note: The marker storage post (if equipped) may
need to be moved out board on the frame to clear
the control module.

13. Connect the 28" hose from the control valve

block to the motor. Connect the cable from
drive motor encoder to the controller cable.

Note: All connectors are specific so no incorrect
connections can be made.

Hydraulic

hose to motor

Measure from center of frame

Figure 6

Line Shaft Sprocket

Figure 7

Drive Chain

Figure 8

Control Module

19973

19971

19974

36 tooth

sprocket

Lock collar

(7 1/2" spacing

shown)

Advertising