Pre-assembly preparation, Tools required, Work location – Great Plains NTA3007HD Operator Manual User Manual

Page 2: Prepare air drill

Advertising
background image

2

Great Plains Manufacturing, Inc.

Front Page

Part Lists

Contact Drive Update

166-367M

Front Page

Part Lists

02/21/2012

Pre-Assembly Preparation

Tools Required

• cutting torch

• wire or rod welder, and welding safety equipment,

including a fire extinguisher

• ground (earthing) rod, cable and clamp (or access to

suitable electrical safety ground reference conductor)

• suitable tractor for raising and unfolding air drill

Great Plains 821-001C spray paint, or green exterior

enamel close to Pantone 356C, DuPont 262 or
PPG 43817

• basic hand tools

Work Location

1.

Move the air drill to a location with:

Prepare Air Drill

2.

Raise implement with tractor.

3.

Unfold implement.

4.

Install lift and transport locks.

5.

Disconnect all harnesses to tractor.

6.

Connect a grounding cable from the center section
main frame to earth ground

• flat, non-combustible surface free of flammable

materials

• adequate illumination

• clear surface beneath for recovery of any falling or

dropped parts

Burn and Fire Hazards:
This update requires cutting and welding thick metal. Perform
the work clear of flammable materials. Wear suitable protec-
tive equipment. Allow hot parts to cool before continuing
work.

Crushing and Sharp Object Hazards:
Be careful working near openers. Discs and other parts may
be sharp.

Equipment Damage Risk:
Disconnect harnesses and ground frame before welding.
Connected harnesses or ungrounded frame during welding
can result in permanent damage to seed monitor components.

Advertising
This manual is related to the following products: