Mount control box – Great Plains 4000-3S Assembly Instructions User Manual

Page 7

Advertising
background image

2/17/2005

195-252M

Great Plains Mfg., Inc.

7

Installation Instructions

Mount Control Box

Figure 11

18987

Refer to Figure 11

1.

Mount control box (1) in a convenient location
in tractor cab. Plug harness extension (2) into
control box. Connect control box to a 12-volt
power source such as your tractor battery.

NOTE: Connect red wire to positive terminal and
black wire to negative terminal.

2.

Route wiring harness (3) through drill tongue.

3.

Plug two-pin connectors (4) from wiring har-
ness into coils on block. Look for letters L, C
and R on leads to identify left, center and
right.

4.

Plug wiring-harness lead into control-box
lead (5).

5.

Secure wiring harness so it will not be dam-
aged during lifting, folding, transporting or
field turns.

6.

Install solenoid (6).

On drills serial number YY1019 and earlier

with bypass valve at tractor:

Install solenoid (6) into front port in bypass
valve. Plug two-pin connector on harness ex-
tension (7) into solenoid.

On drills serial number YY1020 and later
with bypass valve on drill:

Install solenoid (6) into top port on bypass
valve (8).Plug two-pin connector from monitor
lead(s) marked with letter "S" into solenoid.

Advertising