Mount second inner yp1225/1625 smartboxes, Igure 20 – Great Plains Smartbox Mount Kit Yield Pro Planters User Manual

Page 12

Advertising
background image

Great Plains Mfg., Inc.

12

Smartbox® Mount Kit

403-206M

12/12/2006

Mount Second Inner YP1225/1625 Smartboxes

Refer to Figure 19 and Figure 20

The components for this step are identical to those of
Step 25 through Step 32. There are two procedural dif-
ferences from mounting the inner-most frames:

33. Insert a 1

1

4

in bolt (26) in the slotted mounting hole

just forward of center

on one side of the frame

. Slip the shorter end of a clamp (18) over the

bolt (26) and add a flange lock nut (31). Put only a
few turns on the nut.

34. Position the frame

on the tube

and against

the jog plate

.

35. Insert a 4in bolt (27) in the forward slotted hole

of the frame

, and then down through the hole in

the clamp (18), and add a flange lock nut (31). Put
only a few turns on the nut.

36. Repeat Step 33 through Step 35 for the other side

of the frame

.

37. Position Smartbox base container/meter or

container/splitter/meter assembly

in the frame

, having the meter ports biased to the Right, and

secure with fasteners provided by AMVAC.

38. Slide the complete assembly fully forward and

against the jog plate

, and the tube

, before

final tightening.

39. Repeat Step 33 through Step 38 for the second

innermost Smartbox on the right side of the
machine, using a Smartbox base container/meter
or container/splitter/meter assembly with the meter
exit port(s) biased to the Left.

Figure 19

YP1225/1625 2nd Mount

25328

18

27

31

26

U

D

B

F

R

L

18

Figure 20

YP1225/1625 2nd Inner

24169

Advertising