Right/left stiffener bars (yp2425 only) – Great Plains Smartbox Mount Kit Yield Pro Planters User Manual

Page 7

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

7

12/12/2006

403-206M

Center Section, Right/Left Support Tubes
(YP2425 only)

Refer to Figure 11

11. Select:

one (20) 403-364D,
(TUBE SQ. 3.0X.25X48.00)
one (37) 806-066C,
(U-BOLT 1/2-13 X 3 1/32 X 4), and
two (30) 803-169C,
(NUT HEX FLG. LOCK 1/2-13 PLT.).

Mount the support tube (20), at tube center. on the
right support arm (17) installed in Step 8.

Loosely secure it with U-bolt (37) and nuts (30).

12. Repeat Step 11 for the left arm installed in Step 9.

Right/Left Stiffener Bars
(YP2425 only)

Refer to Figure 12

The stiffener bars connect the center and right/left sup-
port tubes. In doing so, the bars pass between the fold
cylinders.

13. Select:

one (21) 403-365D,
(STIFFENER BAR)
two (37) 806-066C,
(U-BOLT 1/2-13 X 3 1/32 X 4), and
four (30) 803-169C,
(NUT HEX FLG. LOCK 1/2-13 PLT.).

Mount the stiffener bar (21) so that it joins the cen-
ter and right tubes installed in Step 10 and Step
11.
Align the end of each tube with first bend in the
bar.

Note: The bar mounts on top of the tubes, and the bend

in the bar is down, to maintain clearance from
cylinders during planter operations.

Secure the bar to the tubes with the U-bolt (37)
and nuts (30).

14. Adjust the location of the outer support arm to

keep it centered under the tube. Tighten the nuts at
the arm base.

15. Repeat Step 13 and Step 14 for the left tube.

Figure 11

Left/Right Center Tubes

25203

20

37

30

17

U

D

F

B

L

R

Figure 12

Center Section Tube Stiffener

25204

30

21

37

U

D

F

B

L

R

Advertising