Turbo gang, Depth gauge, Turbo gang depth gauge – Great Plains TC5319 Assembly Manual User Manual

Page 23

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Assembly

19

04/12/2012

Table of Contents

Index

566-046E

Turbo Gang

Note: See machine layouts in Appendix for proper gang

placement. The gang assemblies will come pre as-
sembled from factory and attached to the gang bar.

Refer to Figure 17
90. Install the gang assembly

using 1 x 9 1/2 hinge

pin

, secure with 3/8 x 2 1/4 Gr. 8 hex bolts

, 3/8

top lock nuts.

91. Attach cylinders

to ears on gang bars and gang

mounts, secure with 1 x 3 1/8 pins

, 1.5 x 1.0 x.075

machine washers and 3/16 x 2 cotter pins.

92. Tighten all bolts to specs, See “Torque Values

Chart” on page 27.

Depth Gauge

Refer to Figure 18
93. Install the link mount

to the center gang bar with

1/2 x 3 1/32 x 7 1/4 u-bolt

, 1/2 lock washers and 1/

2 nuts.

94. Install leveling weldment

to the center gang mount

with 1/2 x 5 1/32 x 4 1/2 u-bolts

, 1/2 lock washers

and 1/2 nuts.

95. Slide the depth gauge pointer

over the leveling

weldment bolt, secure with 1/2 lock nut.

96. Align one set of holes in the two links

, one on

each side of the depth gauge pointer hole

, secure

with 1/2 x 1 1/2 bolt

and 1/2 lock nut.

97. Attach the other end of the links

, one on each side

of the hole in the link mount

with 1/2 x 1 1/2 bolt

and 1/2 lock nut.

98. Tighten all u-bolts to specs, See “Torque Values

Chart” on page 27. Tighten the three lock nuts up
snug, but be sure the links will pivot.

99. Clean the surface where TC depth coulter decal

goes and peel backing off of decal and fasten decal
on plate. Firmly press decal to get all air bubbles out.

Figure 17

Turbo Gang

42013

1

4

2

5

3

1

2

3

4

5

Figure 18

Depth Gauge

42016

4

7

8

1

5

2

3

9

6

1

2

3

4

5

7

5

8

7

1

8

9

Advertising