Assembly, Tools required, Pre-assembly checklist – Great Plains 606NT Predelivery Manual User Manual

Page 6

Advertising
background image

605NT and 606NT

151-061Q

8/19/2009

4

The following headings are step-by-step instruc-
tions for assembling the 605NT and 606NT. Begin
with “Tools Required” and “Pre-Assembly Check-
list” to make sure you have all necessary parts
and equipment. Follow each step to make the job
as quick and safe as possible and produce a prop-
erly working machine.

The 605NT and 606NT are shipped via flat bed
truck. It is the dealer’s responsibility to unload the
new machine. Unload all equipment before begin-
ning assembly. Do not attempt any assembly work
while the 605NT or 606NT is on the truck.

Tools Required

Fork-lift, overhead hoist or loader

General hand tools

Pre-Assembly Checklist

1.

Before assembling, read and understand “Im-
portant Safety Information,” beginning on
page 1.

2.

Have at least two people on hand while as-
sembling.

3.

Make sure assembly area is level and free of
obstructions (preferably an open concrete ar-
ea).

4.

Have all major components.

5.

Have all fasteners and pins shipped with
605NT and 606NT.

IMPORTANT: If a pre-assembled part or fas-
tener is temporarily removed, remember
where it goes. Keep the parts separated.

6.

Have a copy of the parts manual on hand. If
unsure of proper placement or use of any part
or fastener, refer to the parts manual.

7.

Check that all working parts are moving free-
ly, bolts are tight, and cotter pins are spread.

8.

Check for proper tension and alignment on all
drive chains.

Assembly

Parts

M

anual

Advertising
This manual is related to the following products: