Pre-assembly preparation, Tools required, Work location – Great Plains 3P1006NT Assembly Instructions User Manual
Page 2: Prepare implement
Advertising

2
Great Plains Manufacturing, Inc.
Lift Assist Update
151-181M
05/05/2011
Pre-Assembly Preparation
Tools Required
• two jack stands to support implement frame
• hoist (1000 lb capacity) to aid in moving heavy parts
• basic hand tools
Work Location
1.
Move the implement to a location with:
Prepare Implement
2.
Secure for safety.
Crushing and Sharp Object Hazards:
Be careful working under raised implement.
• flat, smooth non-flammable surface free of com-
bustibles
• adequate illumination
• clear surface beneath for recovery of any falling or
dropped parts
Figure 2
Implement with New Lift Assist
28213
U
D
F
B
L
R
Advertising
This manual is related to the following products: