Weight Package Assembly (Optional)

Refer to Figure 26
Caution:Lower machine until coulters are on ground and
pressure is off leveling system.

Note: Install up to 2 sets of weights (4 weights) in positions

shown.

49. Start by removing the 3/4 x 2 Gr. 8 bolts

from level

bar assembly.

50. Pivot level bar

up so there will be clearance to set

the 750 pound weight assemblies

into place.

51. Pivot level bar spring assembly

forward.

52. Carefully lower the 750 pound weight assemblies

onto center frame trusses

, two on front side of fold

cylinders and two on rear side of fold cylinders.

53. Slide rear weights as far forward as possible and install

weight box stops

on inside of trusses as close to

weight as possible (rear weights), secure with 1/2 x 4
1/32 x 5 1/4 u-bolt

, 1/2 lock washers and 1/2 nuts.

54. Torque u-bolts to 85 ft-lbs.

Refer to Figure 27
55. Pivot level bar

and the level bar spring assembly

until holes in plates are aligned.

56. Re-install 3/4 x 2 Gr. 8 bolts

, secure with 3/4 lock

washers and 3/4 nuts.

57. Torque 3/4 x 2 Gr. 8 bolts

to 375 ft lbs to be sure

bolts do not work loose and cause damage to
machine.

Figure 26

Weight Package

42407

2

3

6

7

1

4

4

5

5

1

2

4

3

4

5

6

7

Figure 27

Level Bar

42408

2

3

1

1

3

1

1

Advertising
This manual is related to the following products: