Parking, Storage, Unfolded storage – Great Plains 4000TM Operator Manual User Manual

Page 35

Advertising
background image

Great Plains Manufacturing, Inc.

Operating Instructions

31

12/03/2013

586-537M

Parking

Follow these steps when parking the implement for peri-
ods of less than 36 hours. For longer periods, see Stor-
age
, the next topic.

1.

Position the implement on firm, level ground.

2.

Raise, fold and lock implement (page 16).

Negative Tongue Weight Hazard:
If rear tow hitch is installed it is possible that the Turbo Max
can tip over backwards during hitching and unhitching result-
ing in severe injury or death.

Refer to Figure 36
3.

Remove jack from storage position and pin securely
to lifting stob on outside of implement tongue

. See

Hitching Turbo Max to Tractor” on page 13.

4.

If ground is soft, place a wide block or plate under the
jack to increase contact area.

5.

Un-hook electrical lines and protect with any plugs or
caps provided.

6.

Release pressure on hydraulic system, then discon-
nect hydraulic lines and pull all lines back onto imple-
ment tongue. Store hose ends in keyholes of hose
holder bracket.

7.

Disconnect the safety chain.

8.

Unhitch from tractor or leading implement.

Storage

Store the implement where children do not play. If possi-
ble, store inside for longer life.

1.

Raise, fold and lock implement (page 16) For
unfolded storage, see steps at right.

2.

Perform Parking checklist above.

3.

Lubricate the implement at all points listed under
Lubrication” on page 32.

4.

Check all bolts, pins, fittings and hoses. Tighten,
repair or replace parts as needed.

5.

Check all moving parts for wear or damage. Make
notes of any parts needing repair or replacement
before the next season.

6.

Lubricate all points listed in Maintenance to prevent
rust.

7.

Clean Turbo Max of mud, dirt, excess oil and grease.

8.

Grease exposed cylinder rods to prevent rust.

9.

Use touch-up paint to cover scratches, chips and
worn areas to prevent rust.

Figure 36

Front Jack (Parking)

42244

1

Unfolded Storage

See page 16 for details on maintenance lock.

1a. Raise implement.
1b. Verify the transport locks are in the transport posi-

tion.

1c. Be sure hydraulics are depressurized. Adjust locking

valves to the open position. Unfold wings until wing
is resting on shims.

1d. Lower implement onto lock channels.
1e. Set all hydraulic remotes to Float.

1

Advertising
This manual is related to the following products: