Leveling drill – Great Plains 2020P Operator Manual User Manual

Page 19

Advertising
background image

4/23/2010

118-740M

17

Preparation and Setup

Leveling Drill

Refer to Figure 2

10 Series Openers
Initially adjust drill so bottom of opener tube runs
24 inches above ground when drill is lowered in
the field.

To adjust:

Refer to Figure 3

1.

Loosen jam nut near top clevis of each
gauge-wheel turnbuckle.

NOTE: Jam nut is left-hand threaded.

2.

Make sure upper clevis (2) is in upper mount
hole.

3.

Set turnbuckle length. Turn turnbuckle to
shorten or lengthen as necessary. Initially set
length to 17 1/2 inches between pin centers to
achieve the 24-inch dimension mentioned
above. When adjusting the turnbuckle length,
remember:

Lengthening turnbuckle raises drill.

Shortening turnbuckle lowers drill.

4.

After adjusting both turnbuckles to the same
length, tighten jam nuts.

5.

Level drill with top three-point link.

Refer to Figure 4

NOTE: When drill is level, parallel links will be
running slightly uphill towards the front.

The 1- to 1 1/2-inch dimension shown in is a gen-
eral dimension that will vary with planting condi-
tions.

Make sure the opener mount is running higher than
the opener body. This will ensure an ample reserve
for opener upfloat in case the opener strikes a rock or
other object.

Figure 2

Initial Operating Height

18279

Figure 3

Gauge-Wheel Turnbuckle

12067

Figure 4

Leveling the Drill

18289

Advertising
This manual is related to the following products: