Preparation and setup, Post-delivery/seasonal setup, Pre-planting setup – Great Plains 3S-4000F Operator Manual User Manual

Page 20

Advertising
background image

195-394M

Table of Contents

Index

2014-06-10

16

3S-4000

Table of Contents

Index

Great Plains Manufacturing, Inc.

Preparation and Setup

This section helps you prepare your tractor and 3S-4000
Drill for use.You must level the drill, adjust drill tongue
height to match your tractor drawbar height, hook up the
drill hydraulics to the tractor, and check that the
hydraulics have been bled.

Post-Delivery/Seasonal Setup

On initial delivery, use with a new tractor, and seasonally,
check and as necessary, complete these items before
continuing to the routine setup items:

• Bleed hydraulic system (page 74).

• Wing leveling and alignment (page 18).

• Marker setup (page 42)

• De-grease exposed cylinder rods if so protected at last

storage.

Pre-Planting Setup

Complete this checklist before routine setup:
Read and understand “Important Safety

Information” on page 1.

❑ Check that all working parts are moving freely, bolts

are tight, and cotter pins are spread.

❑ Check that all grease fittings are in place and

lubricated. See “Lubrication” on page 84.

❑ Check that all safety decals and reflectors are

correctly located and legible. Replace if damaged.
See “Safety Decals” on page 6.

❑ Inflate tires to pressure recommended and tighten

wheel bolts as specified. See “Specifications and
Capacities
” on page 96.

Advertising
This manual is related to the following products: