Field operation, Field set-up checklists, Final checklist – Great Plains 3000TM Operator Manual User Manual

Page 29: Field operation field set-up checklists

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

25

10/29/2013

Table of Contents

Index

586-536M

Field Operation

This implement is designed to be pulled in the lowered
field position (including wide turns). Lifting for short dis-
tances to clear residue clogs is acceptable. Lifting for
tight turns or reverse moves is required.

Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with harrows on
the ground. If the inside tire stops or rolls backward, the turn is
tight and requires lift.

Field Set-Up Checklists

Use the following tables to develop a final checklist for
your tractor/Turbo Max configuration. Additional or fewer
steps may be necessary depending on tractor features,
Turbo Max options and accessories.

Final Checklist

Mechanical Checklist

Page

❑ Turbo Max hitched

14

❑ Hitch pin locked

-

❑ Safety chain secured to tractor or leading

implement

14

❑ Parking jack stowed

14

❑ Check all tire pressures

32

❑ Transport locks and locking valves are in

the field position

16

Hydraulic System Checklist

Page

❑ Check tractor hydraulic reservoir full

-

❑ Make hydraulic connections

15

❑ Inspect connections for leaks

-

❑ Unfold Implement

-

Perform all steps in “Pre-Start Checklist” on page 23
and “Final Checklist” on this page.

Do not make short radius turns with the implement in the
ground.

Note: If you stop in the middle of a pass, raise the imple-

ment and back up 10’ before resumption of tilling.

Electrical Checklist

Page

❑ Verify electrical hookups solid, or connec-

tor securely stowed if not using lights in
field.

15

First Pass Operation Checklist

Page

1. Implement unfolded and aligned for first

pass.

-

2. Pull forward, lower Turbo Max, and begin

tilling for a short distance.

-

3. Stop. Assess:

• coulter depth

• finishing attachment operation

-

4. Make necessary adjustments

26

Sharp Field Turns Checklist

Page

1. Raise Turbo Max

-

2. Make turn

-

3. Lower Turbo Max

-

4. Resume tilling.

-

Ending Tilling Checklist

Page

1. Suspend operations as above

-

2. Lift implement

-

3. Set tractor for fold

17

4. Fold wings

-

5. Place locking valves in transport position

16

6. Place transport locks in transport position

16

7. Lower implement on to transport locks

-

8. Lights ON for transport

-

Advertising
This manual is related to the following products: