Center gang bar 1800 – Great Plains 4000TM Assembly Manual User Manual

Page 24

Advertising
background image

20

1800-3000TM

Table of Contents

Index

Great Plains Manufacturing, Inc.

586-536E

Table of Contents

Index

04/12/2013

Center Gang Bar 1800

Note: Refer to center gang bar assembly in “Parts Man-

ual” for correct part numbers of all components.

Refer to machine layout drawings in this manual
for correct gang assembly placement.

Refer to Figure 19
73. Position gang assemblies

in proper locations.

Install the gang pivot bolt

through tubes of gang

bars and tubes on center frame, secure with 1 1/4
flat washers

(one on top and one on bottom), 1 1/

4 slotted nut

(one on top and one on bottom).

Tighten bolts snug, torque to 350 to 400ft-lbs. Install
the 3/16 x 2 cotter pins

through 1 1/4 slotted nuts

and bend over to secure.

Note: Be sure turnbuckle assembly

is preset at 62”

before installing as shown below. See gang angle
adjustment in “Operator Manual” before going to
field.

74. Install turnbuckle assembly

, adjustable end on ear

on front of rear gang bars and fixed end on ear of
front gang bars. Secure with 1 x 3 1/4 clevis pin

,

1.5 x 1.00 x 0.075 machine washer

and 3/16 x 2

cotter pin

.

75. Install the round tubes

(two on each gang bar)

between bottom front plate

(slotted hole toward

rear), rear plates

and plates on center frame.

Install the 3/4 x 6 hex bolts

, 3/4 lock washers and

3/4 nuts. Attach other ends of plates

and

to

bottom of center frame with 3/4 x 2 hex bolts

and

3/4 lock washers.

76. Install bracket

on bottom side of gang bar plate,

secure with 5/8 x 3 1/2 hex bolts

, 5/8 lock wash-

ers and 5/8 nuts.

77. Now the gang cylinders

may be hooked up with

the 1 x 3 1/8 clevis pin

, 1.5 x 1.00 x 0.075

machine washer

and 3/16 x 2 cotter pin

.

78. Bolts may be tightened to specs, See “Torque Val-

ues Chart” on page 38 and all cotter pins may be
bent.

1

2

3

4

5

4

6

6

7

8

5

11

9

10

12

9

10

13

14

15

16

17

8

5

Advertising