Field set-up checklists – Great Plains NP30A 30-foot Operator Manual User Manual

Page 84

Advertising
background image

80

NP30A or NP40A

Table of Contents

Index

Great Plains Manufacturing, Inc.

407-502M

Table of Contents

Index

2014-05-20

Field Set-Up Checklists

Use the following tables to develop a final checklist for
your tractor/fertilizer applicator configuration. Additional
or fewer steps may be necessary depending on tractor
features, fertilizer applicator options and accessories.

Mechanical Checklist (Tractor Hitching)

Page

Fertilizer Applicator hitched

30

Hitch pin locked (pull-type)

Safety chain secured to tractor (pull-type)

30

Parking jack or stands stowed

30

Electrical Checklist

Page

Verify electrical hookups solid

34

Turn console POWER switch to ON. Check
console and observe any diagnostic
messages

a

a. Refer to console manual.

Hydraulic System Checklist

Page

Check tractor hydraulic reservoir full

-

Make hydraulic connections

35

Inspect connections for leaks

-

Perform a raise operation
(leave transport locks in)

48

Unfold applicator

58

Row Units Checklist

Page

Check tubing connections to knives/tines

Check knife/tines outlets

Check knife/tine shoe condition

Check shoes all at same height

Check knife/tine shank alignment

Check knife shear bolts in place

95

Check coulter height

94

Check coulter-to-row alignment or caster

94

Check sealer adjustments

97

Check sealer disc or spider condition

Mechanical Checklist (post-Hitching)

Page

Raise applicator.

48

Disengage transport locks

44

Engage hydraulic depth stop (if nec.)

45

Check front-to-rear level

38

Check side-to-side level

86, 124

Set application depth

91

NH

3

System Checklist (Cart Unhitched)

Page

Shut-off rope routed to tractor cab

33

Emergency shut-off valve closed

67

On/off solenoid valve closed

67

Control valve closed

67

Console POWER switch off

67

All bleed valves closed (3 or more)

68

Breakaway coupler mated (visual check)

68

All hydrostatic relief valve caps seated

68

Mechanical Checklist (Cart Hitching)

Page

Nurse tank hitched

69

Hitch pin locked

Safety chains secured

69

NH

3

Checklist (Cart Hitched)

Page

Check breakaway firmly mated

70

Check breakaway swivel function

70

Remove inlet Acme cap.

70

Inspect inlet with mirror.

70

Check withdrawal valve and all nurse tank
hose valves closed

71

Check for signs of liquid NH

3

in hose

71

Separate hose and Acme plug

71

Route hose to breakaway

71

Connect hose to breakaway

71

Advertising
This manual is related to the following products: