Purging hydraulic system 3000 – Great Plains 3000TM Predelivery Manual User Manual

Page 19

Advertising
background image

Great Plains Manufacturing, Inc.

Assembly

15

03/19/2014

586-536Q

Purging Hydraulic System 3000

Refer to Figure 16

55. Charge the lift system first. Extend the lift cylinders

(black handles) until the center section is fully raised.
Remove the cylinder transport locks

and store on lift

straps

. Raise and lower the lift system several times to

purge air from system. Retract and extend the gang sys-
tem

(Red Handles) several times to purge air from sys-

tem. Watch for leaks and retighten fittings if necessary.

56. You may now charge the fold system. Before charging the

fold cylinders

, make sure the rod end of the cylinders

(are un-bolted or un-pinned and block is placed under cyl-
inders as shown, so that when the rod is extended, it will
clear the wing fold brackets. Extend the fold cylinders
(green ends) completely and then close them. Extend
and retract the cylinders several times to purge air from
the system.

57. Now the rod end of fold cylinders

may be hooked up to

wing with the 1 x 3 1/8 usable pin

, 1.5 x 1.0 x.075

machine washer and 3/16 x 2 cotter pin. Bend cotter pin
over to secure.

Figure 16

Purging Hyd. System 3000

42278

6

5

3

1

4

2

2

1

2

3

4

5

5

5

6