Great Plains 3000TM Predelivery Manual User Manual
Page 29
Advertising

Great Plains Manufacturing, Inc.
Assembly
25
03/19/2014
586-536Q
Refer to Figure 30
108.Pivot level bar
and the level bar spring assembly
until holes in plates are aligned.
109.Re-install 3/4 x 2 Gr. 8 bolts
, secure with 3/4 lock
washers and 3/4 nuts.
110.Torque 3/4 x 2 Gr. 8 bolts
to 375 ft-lbs to be sure
bolts do not work loose and cause damage to
machine.
Figure 30
Level Bar
42408
2
3
1
1
3
1
1
Advertising
This manual is related to the following products: