Great Plains 3000TM Predelivery Manual User Manual

Page 29

Advertising
background image

Great Plains Manufacturing, Inc.

Assembly

25

03/19/2014

586-536Q

Refer to Figure 30
108.Pivot level bar

and the level bar spring assembly

until holes in plates are aligned.

109.Re-install 3/4 x 2 Gr. 8 bolts

, secure with 3/4 lock

washers and 3/4 nuts.

110.Torque 3/4 x 2 Gr. 8 bolts

to 375 ft-lbs to be sure

bolts do not work loose and cause damage to
machine.

Figure 30

Level Bar

42408

2

3

1

1

3

1

1

Advertising
This manual is related to the following products: