Install tongue, Route hoses and cables – Great Plains NP30A 30-foot Predelivery Manual User Manual

Page 34

Advertising
background image

30

NP30 or NP40

Table of Contents

Index

Great Plains Manufacturing, Inc.

407-313Q

Table of Contents

Index

08/30/2011

Install Tongue

If the implement is a 2-point or 3-point model, continue at
Install SMV Reflector” on page 31.

Refer to Figure 40
147. Select two sets:

805-168C PIN HITCH 1 7/16 X 8 3/8 PLT

805-185C PIN COTTER .186 WIRE DIA

148. Raise the rear of the tongue

into alignment with

the lower holes

of the 3-point hitch. Secure with

pins

and cotter pins

.

Route Hoses and Cables

Refer to Figure 41
149. Loosen fasteners at hose clamps

on tongue.

150. Route implement hydraulic hoses under clamps,

leaving enough slack at pins for tongue to dip well
below level on hills afield.

151. Route lighting harness and controller harness

(Option) through clips

on top of hose clamp

stacks.

152. Coil excess hose and cable in the wire loop

.

153. Store the lighting connector in the rain cap

.

154. Store two hydraulic hoses in the caddy keyholes

.

Figure 40

Install Tongue

31021

69

39

68

3

68

69

39

3

68

69

Figure 41

Tongue on Trailer

31720

81

76

34

42

37

37

42

76

81

34

Advertising
This manual is related to the following products: