Pre-Delivery Planning

To meet highway clearance requirements, Nutri-Pro

®

implements are shipped with a few components and/or
sub-assemblies uninstalled.

The exact list and status of uninstalled components var-
ies with implement model, implement width, hitch type
and options ordered. Shipping configuration may change
over time.

This manual assumes a hypothetical extreme case of
disassembly. Inspect the delivered implement, and skip
steps that are already completed or that do not apply to
the present implement.

Tools Required

• One or more lifters with a combined capacity of

12,000 to 15,000 pounds (5450-6800 kg)

• 1

1

4

in hitch pin (for drive-off unload of 2-Point or

Pull-Type implements at pit or side dock)

• Adjustable stands or supports.

• Hydraulic oil (3 to 5 gallons, 11 to 19 liters)

• Basic hand tools

Work Space Requirements

Final assembly of the applicator requires a well-lit, flat
surface space large enough to accommodate the fully
unfolded implement, any wing extensions, any pull-type
tongue, any rear casters, and lifter access from all sides.

Delivery Cycle

Standard Great Plains deliveries do not include time for
implement assembly while still on the trailer bed. If you
are reviewing this manual prior to delivery, and you antic-
ipate that you might have a problem implementing the
unload instructions, notify Great Plains prior to shipment.