Seeding with both compartments, Transporting, Warning – Great Plains CP1000 Operator Manual User Manual

Page 17

Advertising
background image

15

Section 2 Operating Instructions

7/5/2005

CP1000 Three-Meter Drill and Hitch 148-358M

Great Plains Mfg., Inc.

Seeding with Both Compartments
1.

Clean out boxes as explained under Fertilizer Clean
Out
, “Maintenance and Lubrication,” on page 34.

2.

Open divider door between seed and fertilizer com-
partments. To open door, loosen black knobs (1)
shown in Figure 2-7. Loosen knobs until bent clips can
be turned off door. When all bent clips have been
turned, swivel door back against fertilizer-tray open-
ing.

Figure 2-7

Divider Door

3.

Use vinyl washout cover to hold divider door open as
shown in Figure 2-8.

Figure 2-8

Divider Door Secured

4.

To avoid unnecessary wear, remove fertilizer drive
chains.

Transporting

!

WARNING!

Towing the implement at high speeds or with a vehicle that is
not heavy enough can lead to loss of vehicle control. Loss of ve-
hicle control can lead to serious road accidents, injury and
death. To reduce the hazard:

• Do not exceed 32 kph (20 mph).
• Do not tow an implement that, when fully loaded, weighs

more than 1.5 times the weight of the towing vehicle.

1.

Check that implement is securely hitched to a suffi-
cient tractor. Refer to Hitching Tractor to Implement,

16383

1

1

1

16380

“Preparation and Setup,” page 11. Make sure safety
chain is secured to tractor.

2.

Unload seed box before transporting if at all possible.
The implement can be transported with a full box of
grain, but added weight will increase stopping dis-
tance and decrease manoeuvrability.

3.

Check that tires are properly inflated. Refer to Tire In-
flation Chart
, “Appendix,” page 42.

4.

Know implement dimensions in transport position.
Choose a route that provides adequate clearance
from all obstructions. Refer to “Specifications and
Capacities
,” page 41, for dimensions.

5.

Hydraulically lift drill with transport-lift cylinders.

6.

Install transport lock pins in vertical axle tubes.

Figure 2-9

Lock Pin Installed

7.

Secure pivot-lock tubes for transport. Position tubes
so they are horizontal against hitch frame. See Figure
2-3.

8.

Install lock channel over extended tongue-cylinder
rod.

Figure 2-10

Lock Channel Installed

9.

Plug light-harness lead into tractor connector. Always
use warning lights when transporting drill.

10. Comply with all laws when travelling on public roads.

17208

17217

Advertising