Bio-Rad Model 583 Gel Drying Supports User Manual

Page 8

Advertising
background image

5

Set Up and Operation

2.2 OPERATION

Once the drying parameters are set, they are retained in memory until changed by the user or until power is
turned off.

Table 3

Gel Dryer Operation

Step

Procedure

1.

Turn on the power switch.

2.

Select the drying cycle.

3.

Set the cycle temperature.

4.

Set the cycle time.

5.

Place the gel in the dryer.

6.

Turn on the vacuum pump as directed
in the pump’s instruction manual.

Description

The power switch is located at the back of the gel dryer.
The dryer’s front panel displays OFF when the dryer is
ON.

a.

Press the

CYCLE

key twice.

b.

When the light above the key flashes, press the

RAISE

or

LOWER

key to select either the

PAGE

,

Sequencing

, or

Gradient

cycle.

a.

Press the

TEMP

key twice.

b.

When the light above the key flashes, press the

RAISE

or

LOWER

key to select a temperature

between 50 and 90° C.

a.

Press the

TIME

key twice.

b.

When the light above the key flashes, press the

RAISE

or

LOWER

key to select cycle time.

a. Place the gel and its filter paper backing on the

porous Gel Support.

b. Position the transparent Sealing Gasket over the gel.

c. Close the lid. The Sealing Gasket will seal quickly

once the vacuum pump is started.

Determine whether or not the pump requires a warm-up
period. Bio-Rad’s HydroTech pump does not require a
warm up period.

Advertising
This manual is related to the following products: