Attaching the rack handles, Attaching the slide-shoulder screws – Dell PowerEdge 1800 User Manual

Page 12

Advertising
background image

10

Installing the Tower-to-Rack and Rack-to-Tower Kits

www

.dell.com | support.dell.com

Attaching the Rack Handles

1

Position one rack handle on the side of the chassis so that the handle’s pull-loop is nearest the
top of the system. See Figure 1-6.

2

Align the three screw holes on the rack handle with the three screw holes on the side of
chassis.

3

Use three of the hex-head Phillips screws that are supplied with your kit to secure the rack
handle to the chassis.

NOTE:

To obtain proper alignment of the rack handle, tighten the top screw first, the bottom screw

second, and the middle screw last.

4

Repeat step 1 through step 3 to attach the other rack handle.

Figure 1-6.

Installing the Rack Handles

Attaching the Slide-Shoulder Screws

Your kit includes six shoulder screws that enable the system to be attached to rack slides. Attach
three slide-shoulder screws to each side of the chassis. See Figure 1-7.

rack handles (2)

hex-head Phillips
screws (6)

pull-loop

P2648bk0.book Page 10 Thursday, October 14, 2004 11:18 AM

Advertising