Installing system board options – Dell PowerEdge 2500SC User Manual

Page 49

Advertising
background image

Back to Contents Page

Installing System Board Options

Dell™ PowerEdge™ 2500 Systems Installation and Troubleshooting Guide

This section describes how to install the following options:

l

Expansion cards

l

Memory upgrades

l

Microprocessor upgrades

l

Integrated RAID controller

This section also includes instructions for replacing the fan assemblies, cooling shroud, power supplies, RAID battery, and system battery, if necessary.

Use

Figure 6-1

to locate the system board features.

Table 6-1

describes the system board connectors and sockets.

 

Figure 6-1. System Board Features

 

Table 6-1. System Board Connectors and Sockets

 

  

Removing and Replacing Fan Assemblies

  

Expansion Cards

  

Removing and Installing the Cooling Shroud

  

Removing and Installing a Power Supply

  

Adding Memory

  

Microprocessor Upgrades

  

Activating the Integrated RAID Controller

  

Replacing the System Battery

WARNING:

Before you perform this procedure, you must turn off the system and disconnect it from its power source. For more information, see

"

Safety First— For You and Your System

" in "Troubleshooting Your System."

 

Connector or Socket

 

Description

SCSI BACKPLANE

Hot-pluggable SCSI backplane board interface cable connector

RAID BAT

RAID battery connector

BATTERY

System battery connector

COMn

Serial port connectors; sometimes referred to as COM1 and COM2

Advertising