Heater shell assembly – Vermont Casting 2996 User Manual

Page 14

Advertising
background image

14

Vermont Castings Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters

20003457

Heater Shell Assembly

Unpack the cast iron stove shell parts from the ship-
ping carton. Inspect each part for shipping damage and
set them aside on a protective surface.

Porcelain

enamelled surfaces are fragile. Handle porcelain
enamelled castings gently.

1. Use only the rear shroud supplied with this firebox.

Attach the rear shroud to the left side plate by
aligning the key holes with the two wingbolts (A)
installed in the side. (Fig. 13) If necessary, turn the
wingbolts to orient the blades vertically. Slide the
shroud downward to engage it behind each washer
(B) and then tighten the wingbolts.

2. Attach the Right Side Plate to the Rear Shroud. (Fig.

14) Align the two side plates to be perpendicular to
the Rear Shroud as in Figure 15.

3. Move the entire assembly close to the stove’s final

position.

ST106

90

°

Fig. 15 Align both sides with rear shroud.

B

A

B

A

B

A

B

A

ST324

Fig. 14 Fasten the right side to the rear shroud.

ST471

PDV20

SDVR

B

A

B

A

C

Fig. 13 Fasten the left side to the rear shroud.

B

A

B

A

C

ST323/470

PDV20

SDVR

Advertising
This manual is related to the following products: