Head anchor & vertical sill anchor installation, Detail #35, Step #38 – EFCO 955 Series User Manual

Page 30: Detail #34, Head anchor and vertical sill anchor installation, Fs97 & ft01 - fabricated parts

Advertising
background image

Detail #35

CENTER

MULLION

CENTER

MULLION

6"

6"

6"

6"

4" MIN.

FT01

MIN.

2 1/2"

1G60

1G59

3/4"

3"

The silde in head anchors, FS97, are installed into the assembled frame head,

The vertical sill anchors, FT01, will be installed prior to

2 per D.L.O. and maintain the anchor dimensions as above.

C

SECTION VI - FRAME INSTALLATION

HEAD ANCHOR AND VERTICAL SILL ANCHOR INSTALLATION

Mark the center lines of the frame mullions on the rough opening. Measure
over from the mullion and jamb centers 6" and 16" O.C.

IG58

MIN.

2 1/2"

3"

FS97

STEP #38

3/4"

6"

Detail #34

L

5" MIN.

OF OPENING

INTERIOR FACE

{FS97 & FT01 - FABRICATED PARTS}

CONT.

PAGE #28

setting the assembled frame, as shown in Detail #35 below.

Refer to Detail #34 below and page #29.

LOCATIONS

ANCHOR

JDA 9/2000

16" O.C.

16" O.C.

Advertising