Head anchor & vertical sill anchor installation, Detail #35, Step #38 – EFCO 955 Series User Manual
Page 30: Detail #34, Head anchor and vertical sill anchor installation, Fs97 & ft01 - fabricated parts
Advertising

Detail #35
CENTER
MULLION
CENTER
MULLION
6"
6"
6"
6"
4" MIN.
FT01
MIN.
2 1/2"
1G60
1G59
3/4"
3"
The silde in head anchors, FS97, are installed into the assembled frame head,
The vertical sill anchors, FT01, will be installed prior to
2 per D.L.O. and maintain the anchor dimensions as above.
C
SECTION VI - FRAME INSTALLATION
HEAD ANCHOR AND VERTICAL SILL ANCHOR INSTALLATION
Mark the center lines of the frame mullions on the rough opening. Measure
over from the mullion and jamb centers 6" and 16" O.C.
IG58
MIN.
2 1/2"
3"
FS97
STEP #38
3/4"
6"
Detail #34
L
5" MIN.
OF OPENING
INTERIOR FACE
{FS97 & FT01 - FABRICATED PARTS}
CONT.
PAGE #28
setting the assembled frame, as shown in Detail #35 below.
Refer to Detail #34 below and page #29.
LOCATIONS
ANCHOR
JDA 9/2000
16" O.C.
16" O.C.
Advertising