BAG B

3

Figure 7

Figure 8

!

Step 1. Position the front bulkhead (20) on top of the front

kickplate (14) and main chassis (19) as shown in Figure 7. Secure
the front bulkhead (20) to the chassis (19) by threading two 4-40
x 3/8" button-head screws (21) through the hole in the top of the
bulkhead (20) and into the chassis (19).

!

There is a short thread-cutting screw included in the

wrench bag. This screw can be used to tap threads in the holes in
the main chassis. Pre-tapping these holes makes it easier to in-
stall the screws during assembly.

!

Step 2. Secure the front kickplate (14) to the front bulkhead

(20) by threading a 4-40 x 3/8" flat-head screw (54) through the
center hole in the front of the kickplate (14) and into the bulk-
head (20).

!

Step 3. Insert two 4-40 x 7/8" cap-head screws (23) — one on

each side — through the second hole out in the top of the front
shock tower (24). Secure the screws (23) to the shock tower (24)
by threading a 4-40 nut (25) over each screw (23) and tightening.

!

Use the included Team Losi wheel wrench/nut-driver

to secure the 4-40 nuts.

!

Step 4. Press a 4-40 mini locknut (7) into the hex area in the

top, rear of each side of the front shock tower (24). Insert a 4-40
x 1/2" flat-head screw (44) into each of the two front body mounts
(56) from the side with the recess for the head of the screw (44)

!

Step 5. Attach a front body mount (56) to the front of each

side of the front shock tower (24) so that the posts point up as
shown in Figure 8. Secure the body mounts (56) by threading
the screws (44) through the tower (24) and into the locknuts (7).

20

14

54

19

21

Figure 7

21

54

23

25

44

24

25

56

44

7