Tjernlund SS1C SideShot with UC1 Universal Control (Version X.02) 8504103 Rev 07/02 User Manual

Page 16

Advertising
background image

15

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED WITH A HONEYWELL R8184

SERIES OR EQUIVALENT PRIMARY CONTROL AND A BURNER MOTOR POST-PURGE

RED JUMPER POSITION MUST BE THE SAME

AS APPLIANCE INTERLOCK VOLTAGE.

UNIVERSAL CONTROL

XN

BURNER

N

MTR

M

THERMOSTAT

OIL VALVE

W

O

WHITE

ORANGE

B

F

F

T

T

IMPORTANT:

XL

J1

J2

115V

DRY

24V

D/N 9183046-4

115 VAC

LEGEND:

CALL
JUMPER

BLACK

HONEYWELL R8184

SERIES OR EQUIVALENT

L1

SS2

COOLING

SS2

MOTOR

MOTOR

IGNITION

TRANS

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

FAN

1. Separate the burner motor wire and ignition transformer from the Orange wire of R8184.
2. Connect the Orange of R8184 to #1 on UC1 terminal block.
3. Connect #2 on UC1 terminal block to White on R8184 or N.
4. Connect the HOT wire of oil solenoid valve to #4 on UC1 terminal block and neutral wire to White or N.
5. Connect burner motor and ignition transformer HOT wires to M terminal on UC1 and neutrals to White or N.
6. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
7. Crimp ground wire to grounding spade in SS1 electrical box.
8. Make sure RED voltage jumper on UC1 is on 115V.

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED

WITH A SINGLE ZONE 24 VAC THERMOSTAT

XN

R

UNIVERSAL CONTROLLER

THERMOSTAT

G

G

INTERNAL CONTROL

OF FURNACE

W

C

Y

R

R

Y

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

W

DRY

115V

24V

IMPORTANT:

D/N 9183046-5

115 VAC

24 VAC

LEGEND:

CALL
JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

1. Connect W from t-stat to #1 on terminal block of UC1.
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler.
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler.
4. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
5. Crimp ground wire to grounding spade in SS1 electrical box.
6. Make sure RED voltage jumper on UC1 is on 24V.

Advertising