Tjernlund SS1C SideShot with UC1 Universal Control (Version X.02) 8504103 Rev 07/02 User Manual

Page 4

Advertising
background image

The SS1C must be installed by a qualified installer (an individual properly licensed and/or trained) in accordance with all
local codes or, in their absence, in accordance with “The National Building Code of Canada” CSA Std B139 & “The Canadian
Electrical Code” CSA Std C22.1.

Failure to install, maintain and/or operate the SS1C in accordance with manufacturer's instructions may result in conditions
which can produce bodily injury and property damage.

1. The installer must verify that the BTU/hr. input of the appliance does not exceed the recommended input of the SS1C. See

“Application Table” on page 1 of these instructions for maximum input capacities.

2. Disconnect power supply from the SS1C and heating equipment when making wiring connections and servicing the SS1C.

Failure to do so may result in personal injury and/or equipment damage. LED #5 (RED) should be off with power removed.

3. Plan the vent layout so that the code required clearances are maintained from plumbing, wiring and combustible materials.

4. The SS1C motor shaft must be mounted horizontally to ensure proper operation of the Fan Proving Switch and prevent

motor bearing wear.

5. Flue gas temperatures must not exceed 301oC (575oF) at SS1C inlet. Ambient temperature must not exceed 40oC (104oF).

6. Oil fuel, flue gas temperature at vent system inlet must be at least 121oC (250oF) during appliance steady state.

7. Make certain power source is adequate for the SS1C requirements. Do not add the SS1C to a circuit when the total

electrical load is unknown.

8. "Safety Inspection of a Previously Used Appliance", below must be completed when replacing a conventional chimney venting

system or when SideShot is installed on used heating equipment.

SAFETY INSPECTION OF A PREVIOUSLY USED APPLIANCE

(Perform prior to SideShot installation)

The following procedure is intended as a guide to aid in determining that an appliance is properly installed and is in safe condition
for continuing use. This procedure is based on central furnace and boiler installations and it should be recognized that general-
ized procedures cannot anticipate all situations. Accordingly, in some cases deviation from this procedure may be necessary to
determine safe operation of the equipment.

a. This procedure should be performed prior to any attempt at modifications of the appliance or installation of the SS1C.

b. If it is determined there is a condition which could result in an unsafe operation, the appliance should be shut off and the owner

advised of the unsafe condition.

The following steps should be followed in making the safety inspection:

1. Visually inspect the venting system and determine there is no blockage or restriction, leakage, corrosion or other deficiencies

which could cause an unsafe condition.

2. Inspect burner and primary control for proper operation.

3. Applicable only to furnaces: Inspect heat exchanger for cracks, openings or excessive corrosion. Check both the limit control

and fan control for proper operation.

4. Applicable only to boilers: Inspect for evidence of water or combustion product leaks. Determine that the water pumps are in

operating condition. Test low water cutoffs, automatic feed controls, pressure and temperature limit controls and relief valves in
accordance with the manufacturer's recommendations to determine that they are in operating order.

SIDESHOT

®

MODEL SS1C TERMINOLOGY

3

Advertising