Tjernlund SS2 SideShot with UC1 Universal Control (Version X.02) 8504105 Rev 07/02 User Manual

Page 15

Advertising
background image

14

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED WITH A HONEYWELL R8184

SERIES OR EQUIVALENT PRIMARY CONTROL AND A BURNER MOTOR POST-PURGE

RED JUMPER POSITION MUST BE THE SAME

AS APPLIANCE INTERLOCK VOLTAGE.

UNIVERSAL CONTROLLER

XN

BURNER

N

MTR

M

9183006

TJERNLUND

PRODUCTS,

INC.

THERMOSTAT

OIL VALVE

W

O

WHITE

ORANGE

B

F

F

T

T

IMPORTANT:

50/60 Hz

115 VAC

SUPPLY

R

XL

J1

J2

115V

DRY

24V

D/N 9183046-4

115 VAC

LEGEND:

CALL
JUMPER

BLACK

HONEYWELL R8184

SERIES OR EQUIVALENT

L1

COOLING

FAN

SS2

SS2

MOTOR

MOTOR

IGNITION

TRANS

SPADE TERMINAL IN SS2 ELECTRICAL BOX.

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED

WITH A SINGLE ZONE 24 VAC THERMOSTAT

XN

R

UNIVERSAL CONTROLLER

THERMOSTAT

G

G

INTERNAL CONTROL

OF FURNACE

W

C

Y

R

R

Y

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

115 VAC
50/60 Hz

SUPPLY

XL

J1

J2

W

DRY

115V

24V

IMPORTANT:

D/N 9183046-5

115 VAC

24 VAC

LEGEND:

CALL
JUMPER

CRIMP GROUND WIRE TO GROUNDING SPADE TERMINAL IN SS2 ELECTRICAL BOX.

IMPORTANT:

1. Separate the burner motor wire and ignition transformer from the Orange wire of R8184.
2. Connect the Orange of R8184 to #1 on UC1 terminal block.
3. Connect #2 on UC1 terminal block to White on R8184 or N.
4. Connect the HOT wire of oil solenoid valve to #4 on UC1 terminal block and neutral wire to White or N.
5. Connect burner motor and ignition transformer HOT wires to M terminal on UC1 and neutrals to White or N.
6. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
7. Crimp ground wire to grounding spade in SS2 electrical box.
8. Make sure RED voltage jumper on UC1 is on 115V.

1. Connect W from t-stat to #1 on terminal block of UC1.
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler.
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler.
4. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
5. Crimp ground wire to grounding spade in SS2 electrical box.
6. Make sure RED voltage jumper on UC1 is on 24V.

Advertising