2 - gateway configuration – FaxBack NET SatisFAXtion 8.6 - Email Gateway Installation Guide User Manual

Page 7

Advertising
background image

NET SatisFAXtion Email Gateway Installation Guide — Page 7

1.2 - Gateway Configuration

Once installed, the first configuration screen comes up

The URL to your fax server should be auto-filled. If there is a password for the Supervisor user, set it and click test connection.

This is needed to create the SMTPPost system user for the gateway. Make sure you get a Test completed successfully dialog back.

If the test does not complete, make sure the NET SatisFAXtion fax server service is loaded and that you can reach the URL

from a web browser. If this step fails, solve this problem before moving forward or the gateway will not be able to communicate with

the fax server. (See troubleshooting section)

Advertising