Installation instructions, Sp-20, Sp-30 – STIEBEL ELTRON S-Power PERFORMANCE SERIES Heat Pipe Collectors User Manual

Page 10

Advertising
background image

Wall/facade, flat roof and corrugated metal installation
(roof and wall)

Set the cap profile in the façade or elevated track.
For wall/façade installation, the cap profile is to be vertically mounted.

i

»

Corrugated metal installation (roof + wall):

Screw the cap profile onto the trapezoid in using self-cutting drill screws (sealing: Silicone among
others). Collector installation same as all other types of fastenings.

1

2

3

a

3

Install on wall or façade

Install on corrugated metal

Mark , drill, insert wall plug , install cap profile
with key screw NW 13 nm , mount with suitable
screws for corrugated metal and flat roof installation,
Slide reflectors-if available-onto the cap profile and
secure with nuts M8.

1

2

3

3

a

10

Cap profile

25.25 inches — 37.75 inches

38.75 inches — 55.5 inches

76.75 inches

Installation instructions

SP-20

SP-30

Stiebel Eltron, Inc.

17 West Street

West Hatfield, MA

01088

Telephone: 800.582.8423 | Fax: 413.247.3369 | [email protected] | www.stiebel-eltron-usa.com

S-Power SP-20

S-Power SP-20

S-Power SP-30

S-Power SP-30

Advertising