Installation instructions, Sp-20, Sp-30 – STIEBEL ELTRON S-Power PERFORMANCE SERIES Heat Pipe Collectors User Manual

Page 11: Simply the best

Advertising
background image

Header

»

Tiled roof installation:

Installation measurements for the
heatpipe collector

76.75 inches

Footer

25.25 inches — 37.75 inches

38.75 inches — 55.5 inches

25.25 inches — 37.75 inches

38.75 inches — 55.5 inches

11

Installation instructions

SP-20

SP-30

Stiebel Eltron, Inc.

17 West Street

West Hatfield, MA

01088

Telephone: 800.582.8423 | Fax: 413.247.3369 | [email protected] | www.stiebel-eltron-usa.com

Simply the Best

S-Power SP-20

S-Power SP-20

S-Power SP-30

S-Power SP-30

S-Power SP-20

S-Power SP-20

S-Power SP-30

S-Power SP-30

Advertising