3. Primary commissioning

For primary commissioning the system scheme has to be selected first

1. After AC power is supplied to the unit it goes through
its power up tests during which the control lamp is blinking
red and green. After this the unit is ready for configuration.
The unit‘s default system scheme is Arr. 1.

2. Clock time adjustment in channel TIME. By pressing the

button once you can adjust hours, pressing it

once again the minutes.The time can be adjusted by buttons
1 and 2 and saved by pressing the

button.

3. - select adjustment channel Arr

- change into

-mode (see 2.1)

- adjustment are saved by pressing button

Now the controller is ready for operation and should enable
an optimum operation of the solar system with the factory
settings.

System survey:
Arr 1 : Standard Solar System
Arr 2 : Solar System with Heat Exchange
Arr 3 : Solar System with After-Heating
Arr 4 : Solar System with Tank Charge in Layers
Arr 5 : 2-Tank Solar System with Valve Logic
Arr 6 : 2-Tank Solar System with Pump Logic
Arr 7 : Solar System with 2 Collectors and 1 Tank
Arr 8 : Solar System with After-Heating by Solid Hot Fuel

Boiler

Arr 9 : Solar System with Heating Circuit Reverse Raising

1

3

2

backward

forward

SET

(selection / adjustment mode)

operating control lamp

Arr 1

Arr 2

Arr 3

Arr 4

Arr 5

Arr 6

Arr 7

Arr 8

Arr 9