3 installation, 1 unpacking, 2 transport – FRITSCH PULVERISETTE 25 User Manual

Page 16: 3 erection, 4 fastening the cutting mill

Advertising
background image

page 15

PULVERISETTE 25

3 Installation

3.1 Unpacking

x Remove the nails with which the protective packing is

fastened on the transport pallet.

x Lift the hood off the transport pallet.
x Check that the items supplied correspond to your order before

proceeding.

3.2 Transport

x Transport the machine on the transport pallet using a fork lift

truck or hand fork lift truck.

x To carry the machine, grip it below at the front and the back.

Do not use the housing for carrying.

Carrying the machine will require at least two persons.

3.3 Erection

x The cutting mill is secured to the transport pallet by four

screws. Undo the four screws.

x Lift the cutting mill off the transport pallet.

Lifting the machine down will require at least two persons.

3.4 Fastening the Cutting Mill

Firmly screw the cutting mill to the supplied frame (according
to the instructions) or to a stable mounting surface (table,
etc.). Observe the following instructions while mounting the
instrument:

x Unscrew the 3 screws holding the motor cover (14) in place.
x Carefully lift off the motor cover (14).
x Two U-profiles (12) are mounted to the bottom side of the

instrument. Run the 4 enclosed screws into the holes of the U-
profiles (12) and screw them to the frame or table.
Other screws with the same diameter may also be used.

Please ensure that the machine is fastened securely, as
considerable transverse forces do occur.

Ensure that there is good access to the cutting mill.

Ensure that to the right of the mill, there is sufficient space
for the upper housing(2) including the funnel (1.22) to be
opened.

Do not block the ventilation louver (18) at the rear. There is a
danger of overheating if the louver is blocked.

Advertising