GF-123

Benchmark 2.0LN Low NOx Boiler

Chapter 2

OMM-0046_0E

Installation, Operation and Maintenance Manual

Installation

PR1 08/20/12

AERCO International Inc.● 100 Oritani Dr. ● Blauvelt, NY 10913. ● Ph: 800-526-0288

Page 23 of 170

For electrical power wiring diagrams, see the AERCO Benchmark 2.0LN Electrical Power Wiring
Guide, (GF-2060LN).

GND

NEU

L1

120 VAC, 1 PHASE

Figure 2-8: AC Terminal Block Configurations

2.9 MODES OF OPERATION AND FIELD CONTROL WIRING

The Benchmark 2.0 Boiler is available in several different modes of operation. While each unit
is factory configured and wired for its intended mode, some additional field wiring may be
required to complete the installation. This wiring is typically connected to the Input/Output (I/O)
Box located on the lower portion of the unit front panel (Figure 2-9) behind the removable front
door.

To access the I/O Box terminal strips shown in Figure 2-10, loosen the four cover screws and
remove the cover. All field wiring is installed from the rear of the panel by routing the wires
through one of the four bushings provided.

Refer to the wiring diagram provided on the cover of the I/O Box (Figure 2-10) when making all
wiring connections.

Brief descriptions of each mode of operation, and their wiring requirements, are provided in the
following paragraphs. Additional information concerning field wiring is provided in paragraphs
2.9.1 through 2.9.9. Refer to Chapter 5 for detailed information on the available modes of
operation.