Benchmark 2.0ln low nox boiler, Gf-123 – AERCO BMK 2.0 LN Natural Gas (SN G-11-1861 and above) User Manual

Page 44

Advertising
background image

Chapter 3

Benchmark 2.0LN Low NOx Boiler

GF-123

Operation

Installation, Operation and Maintenance Manual

OMM-0046_0E

Page 44 of 170

AERCO International Inc.● 100 Oritani Dr. ● Blauvelt, NY 10913. ● Ph: 800-526-0288 PR1 08/20/12

Figure 3-3: SSOV Location

4. Next, the blower proof switch on the Air/Fuel Valve (Figure 3-5) closes. The display will

show Purging and indicate the elapsed time of the purge cycle in seconds.

5. Upon completion of the purge cycle, the Control Box initiates an ignition cycle and the

following events occur:

(a) The Air/Fuel Valve rotates to the low-fire ignition position and closes the ignition switch.

The dial on the Air/Fuel Valve (Figure 3-6) will read between 25 and 35 to indicate that
the valve is in the low-fire position.

(b) The igniter relay is activated and provides ignition spark.

(c) The gas Safety Shut-Off Valve (SSOV) is energized (opened) allowing gas to flow into

the Air/Fuel Valve.

SSOV

GAS

INLET

TO AIR/FUEL

VALVE

MANUAL SHUT-OFF VALVE

Advertising