Final checklist, 10 operation checklist, Installation instructions – GE JD750SFSS User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions

^ FINAL CHECKLIST

Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.

Be sure power is in service to the building.

Check to be sure that all packing materials and tape have been removed. Failure to remove these materials
could result in damage to the appliance once the appliance has been turned on and surface elements have
heated

10 OPERATION CHECKLIST

Check to make sure the Clock display is energized. If a series of horizontal red lines appear in the display,
disconnect power immediately. Recheck the range wiring connections. If change is made to connections,
retest again. If no change is required, have building wiring checked for proper connections and voltage. It is
recommended that the clock be changed if the red lines appear.

Push down and turn any one of the four surface knobs to "MED" setting to observe that the element glows

within 15 seconds. Turn the knob off when glow is detected. If the glow is not detected within the time limit,

recheck the range wiring connections. If change is required, retest again. If no change is required, have
building wiring checked for proper connections and voltage.

10

Advertising
This manual is related to the following products: