It] preparing the opening (continued), Installation instructions – GE JD750SFSS User Manual

Page 3

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions

IT] PREPARING THE OPENING (Continued)

Range support

The Standard Installation of this Drop-In Range is to hong

by the countertop on the side metal flanges under glass
cooktop. This Range must not be installed on a base or
sub structure (2"x

A"

support).

If the construction of your cabinet cannot provide a
1/4" flat area at the back of the countertop opening,

consider changing the countertop to accommodate this
dimension. If the area is not flat, excess tension may

be applied to the glass cooktop, causing breakage and

voiding the warranty.

Countertop thickness 1-1/4" min. is required to support the product. Braces must be installed between the
underside of the countertop and the cabinet if required to obtain 1-1/4" minimum thickness (each side).

Make sure the wall coverings, counters and cabinets around the oven can withstand the heat (up to 200° F

(93.3° C) generated by the oven.

This appliance has been approved for 0" spacing to adjacent surfaces above the cooktop. However, a 5"

minimum spacing to surfaces less than 15" above the cooktop and adjacent cabinet is recommended to
reduce exposure to steam, grease splatter and heat.

Locate the wiringjunction box at the rear of the cutout. The dimension from the top of the wiringjunction
box to the countertop must be a minimum of 28-1/2". The box must not extend more than 3" off the plane

of the wall. Thejunction box must be located where it will allow considerable slack in the range conduit, so
that the range can be pulled out for service if necessary.

Advertising
This manual is related to the following products: