Chamberlain SL 1000-X3 User Manual

Page 32

Advertising
background image

Rev J

Doc 01-20098

Page 32 of 44

2. PREVENTIVE MAINTENANCE INSTRUCTIONS

Figure 23. Gate Operator Disassembly and Assembly.

Gate Operator Serial Number:

UPS: Yes No

Refer to Figure 23 to perform the following.

1. Turn off power to the gate operator at the circuit breaker.
2. Remove the cover mounting bolts and remove the gate operator cover.

3. Perform preventive maintenance tasks 3 to 14, above.
4. After completing all checks, perform the procedure found in Part 2, System

Installation, Paragraph M, Post Installation Procedures.

Gate Operator
Cover (in place)

Clear Plastic
Cover

Control
Box

Cover
Mounting
Bolt

(4 places)

Gate Operator
Cover

Advertising