PART 1

SITE PREPARATION

A. LOCATION AND LAYOUT

Figure 1. Front Drive.

Figure 2. Rear Drive.

Figure 3. Mid Drive.

• Figures 1-3 show typical single gate installations. For location and layout details of

Bi-Parting, Bi-Parting Latch, and Tandem gates, see X3 Series Master/Slave

Systems.

1.

Always install the gate operator on the inside of the fence line, never on the

public side of the fence.

2.

All manual controls and activating devices should be mounted at least 6 feet

away from the gate to provide safety.

3.

Allow enough clearance around the gate and the gate operator for installation

and services, as well as operation of manual disconnect lever.

4.

The gate operator can provide front and rear drive configuration (Figures 1 and

2), and mid drive can be used if the operator is post mounted and clearance is

provided under the operator for the chain anchor on the gate (Figure 3).

5.

Center idlers may be required on the Mid Drive and Rear Drive configurations

to keep the chain from dragging on itself.

NOTE: Master links and tension adjusters are provided with the gate operator.