Cisco XR 12406 User Manual
Page 215

5-51
Cisco XR 12406 Router Installation Guide
OL-13831-01
Chapter 5 Maintaining the Router
Removing and Installing a Clock and Scheduler Card, Switch Fabric Card, or Alarm Card
Caution
When operating a router with a single CSC, the second CSC slot must have a CSC
blank filler installed to ensure electromagnetic compatibility (EMC) compliance,
to avoid overheating, and to ensure compliance with regulatory electromagnetic
interference (EMI) standards.
Use the following procedure to remove and replace a CSC.
Step 1
Loosen the two captive screws on each side of the CSC (
).
Figure 5-32
Removing and Installing a Clock Scheduler Card
1
CSC
3
Ejector lever (2)
2
Captive screw (2)
—
101409
SLO
T-0
GIGABIT R
OUTE PROC
ESSOR
SLO
T-1
COLL
LINK
TX
RX
RJ-45
MII
RESET
AU
X
EJECT
CONSO
LE
CISCO 12000
SERIES
GIGABIT SW
ITCH ROUT
ER
CISCO 12000
SERIES
GIGABIT S
WITCH RO
UTER
1
2
3