Installation, Notice, Page 5 laars sequencing controls – LAARS SC 12 - Install and Operating Manual User Manual

Page 5: Mounting the sc, Set the dip switches, Wiring the power inputs, Wiring the input terminals

Advertising
background image

Page 5

Laars Sequencing Controls

INSTALLATION

MOUNTING THE SC

• Select a location near the equipment to be controlled.

• The surface should be fl at, and be suffi ciently wide and strong to hold the SC.

• Keep the control away from extreme heat or cold. Ambient operating

temperature is from 20 to 120°F.

• Remove the panel from the metal enclosure by removing the top center screw

and loosening the two screws at the bottom of the panel. Lift the panel out.

• Screw the enclosure to the surface through the mounting holes in the back of

the enclosure.

• Be sure to set the dip switches before returning the panel to the enclosure.

SET THE DIP SWITCHES

• The dip switch chart is shown on page 4.

• The dip switch is located on the back on the SC board (the side of the board without

the metal front panel).

• The dip switch sets all of the following:

- System relay output type - Combustion Air Damper, or System Pump operation

- Stage type - On/Off, Lo/Hi, 3 Stage or 4 Stage

- Rotation Sequence - First On/Last Off or First On/First Off

- Input type - Temperature or External Set Point

- Operation - Set Point or Outdoor Reset

IMPORTANT

The dip switches must be set correctly. Carefully, check the details of the installation and

determine the appropriate dip switch settings before continuing on to the next steps.

WIRING THE POWER INPUTS

• Bring the 120VAC 60Hz power wires through a bottom knock out of the enclosure.

Class 1 voltages must enter the enclosure through a different opening from any Class 2

voltage wiring.

• Connect the hot line to terminal marked LINE.

• Connect the neutral line to the terminal marked NEUT.

• The green ground screw must be connected to earth ground.

• Wiring a surge suppressor is recommended before wiring to the SC Control.

WIRING THE INPUT TERMINALS

System Temperature Sensor - Terminals 1, 2, and 3

• The System Temperature Sensor must be installed for the control to operate correctly.

• The SC is designed to be connected to standard brass tube sensor (Laars Part # CA002400).

Contact the factory for additional temperature sensor options.

• Sensor must inserted in a 3/8” well (Laars Part # CA002500).

• Locate the sensor where it will register the water temperature output of all the stages. Sensor

should NOT be installed in between boiler connections to header. If the sensor does not

register the output of all the stages, it will not be able to Sequence properly.

• Temperature sensor wires can be extended up to 500’ by splicing with 18 gauge shielded wire.

• Do not run wire in conduit with line voltage.

• Temperature sensors have no polarity. Connect either wire from the sensor to terminal 1 SENSOR.

• Connect the other sensor wire to terminal 2 COM.

2 COM

2 COM

• Connect the shield to terminal 3 SHIELD.

NOTICE

If the dip switch is changed

during operation, the SC will be

completely reset. Wait until the

SC restarts and then reprogram

all settings.

Mounting Holes

LINE

NEUT

Surge

Suppressor

Power Switch

Ground

Line

Neut

INPUTS

1 2 3 4 5 6

Sensor Com Shield

+

Sensor Com

TEMP

PRES 4-20 ma

Shield

To Temperature Sensor

in Common Header

Advertising
This manual is related to the following products: