Chamberlain ESTATE SERIES SW 2000-X3 User Manual

Page 10

Advertising
background image

4 of 42

Doc 01-20099

Rev F

NOTES

• Left Gate and Right Gate are determined by looking from inside the complex toward

the street.

• Figure 1 shows a typical Bi-Parting gate in standard and compact installations.

1. Always install gate operators inside of the fence line, NEVER on the public side of

the fence.

2. Mount all manual controls and activating devices at least 6 ft. away from the gate

for safety.

3. Allow enough clearance around the gate and the gate operator for installation and

service.

B. PAD AND MOUNT

Figure 2. Pad and Mount.

1. The concrete pad must be sufficient to support the gate operator and the dynamic

forces created by the moving gate. LiftMaster recommends a pad 24” wide by 27”
long by 30” deep.

2. The operator must be level and parallel to the gate, so the pad should be level and

about 4” above grade to prevent water entrance.

3. Four anchor bolts are required to secure the gate operator to the pad. The

mounting holes in the gate operator are 5/8” in diameter. Red Head bolts ½” x 3½“
are recommended.

4. Be sure to provide access for wiring conduits. In Master/Slave systems, remember

to include conduit stubs for separate inputs (if any) and for the Master/Slave
connection cable between gate operators. For more information about
Master/Slave systems, see Master/Slave Systems for X3 Series Gate Operators.

NOTE:

Shading indicates conduit stub access areas.

Advertising