Chamberlain ESTATE SERIES SW 2000-X3 User Manual

Page 37

Advertising
background image

31 of 42

Doc 01-20099

Rev F

PREVENTIVE MAINTENANCE INSTRUCTIONS

Figure 1

8. Gate Operator Disassembly and Assembly.

♦ Refer to Figure 18, above, to perform the following instructions.
1. Turn off power to the gate operator at the circuit breaker and wait for one

minute.

2. Inspect Gate Arm (Swing Arm Cap Assembly, Swing Arm and Drag Link

Assembly) for wear and hardware tightness. Check (

✓ ) its box in the Maintenance

Schedule.

3. Disconnect Drag Link from Anchor, then loosen mounting bolt and remove Swing

Arm Cap Assembly and Drag Link Assembly from drive shaft. Set this assembly
aside.

4. Push and pull the Gate to ensure it swings freely (grease if necessary). Check (

✓ )

its box in the Maintenance Schedule.

5. Remove the cover mounting bolts and remove the gate operator cover.
6. Reinstall the Drag Link, Swing Arm and Swing Arm Cap Assemblies.
7. Perform preventive maintenance tasks 3 to 15.
8. After completing all checks, perform the procedure found in Part 2, System

Installation, paragraph N, Final Assembly of Gate Operator.

Advertising