Arbor installation – New England Arbors VA68133 User Manual

Page 4

Advertising
background image

4

S T E P F O U R

Carefully place the arbor on its side. Continue to insert the

ground stakes to the bottom of the posts until they touch

the bottom rail on the side panel.

Using two screws per post, fasten the ground anchors to

post as shown aside.

1

Arbor Installation

2

A

- Install Ground Stakes

1915 Dove St., Port Huron MI USA 48060

Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286

2

www.edenarbors.com

A

1

1

2

Arbors must be well secured to prevent tipping over from wind load etc.
We have provided four ground anchors for securing the arbor either
into the ground or a concrete footing. In some cases it may be acceptable
to secure the arbor to an existing structure such as a fence post. If you
are installing your arbor on concrete or a deck, see your hardware
store for the appropriate galvanized bracketing hardware.

18

6

Move the arbor to its final location (you will need a helper).

When you are satisfied with the location, mark the positions of

the posts, then move the arbor aside and lay it carefully on its side.

Excavate 4 holes approx 10 in. deep. Carefully move the arbor

back into position and level it both vertically and horizontally.

Backfill the holes with the excavated soil to cover the anchors.

1

2

Complete B #1 above, with the exception of excavating the holes

at least 6in. wide x 18in. deep. Fill holes with wet cement within

3in. of your grade (you will need 2 bags of pre-mix concrete -

purchase separately). Carefully move the arbor back into position.

Support the arbor plumb and level over the holes with bricks,

stones or blocks of wood under the bottom rail of the side panel.

The post bottoms should insert themselves approx 1/2in. into

the concrete.

1

2

B

- Into Earth Without Concrete Footing

C

- Into Earth With Concrete Footing

Optional

If you plan on attaching a fence or bench to the arbor, or in the
event of extreme wind conditions we would not recommend

using the ground anchors provided. Consider purchasing pressure

treated lumber and trimming it down to 3 1/4in. wide and cutting

it into 36in. lengths. Insert into the bottom of all four posts until

they hit the bottom horizontal rail on the side panel. Fasten

accordingly with screws and install either directly into the ground

or into a concrete footing.

B

10”

4

C

Advertising