Step three, Install the side panels, The westchester arbor – New England Arbors VA84234 User Manual

Page 4

Advertising
background image

STEP THREE

Move the side panels to their final location (you will need a helper).

When you have identified the location of each post, as indicated
by the measurements on the first page of these instructions,
mark the positions of the posts, then move the panels aside.

Excavate four holes approx 33” deep. The location and excavation
of these four holes is the most critical step and should be
completed with care. The depth of these holes will allow the
post extension joint to be hidden 3” under the ground.

Carefully move the side panels back into position and level
both horizontal and vertically.

Check your measurements to confirm posts are placed
correctly to receive arch system. THIS IS A CRITICIAL STEP.

Install the Side Panels

1

2

3

4

5

www.newenglandarbors.com

Arbors must be well secured to prevent tipping over from
wind load, etc. Below we have provided two options for you
to extend the posts and mount into a concrete footing.

Into Earth with Concrete Footing (Option One)

(Assuming posts have been extended)

* Do not backfill the holes with cement at this stage.

4

The Westchester Arbor

You have Three Options to Complete this Step.

(All purchased separately)

OPTION ONE -

If Your Arbor:

• is going to be installed with fencing or a gate
• is located in a high wind or hurricane area
• is located in ground conditions that are not level

Consider Using:

A - 5x5 Professional Post Extension Kit (30” long), (Kit of 4)

• Purchase from New England Arbors, www.newenglandarbors.com
• Recommended to be installed in concrete footings
• Follow instructions included with the kit

- or -

B - 4 x 4 x 32” Long Wood Post (4)

• Purchase separate from your local lumberyard
• Recommended to be installed in concrete footing

OPTION T WO -

If Your Arbor:

• is intended to be used as a stand alone garden accent or pathway
• is located on level ground

Consider Using:
5 x 5 Aussie Augers (Kit of 4)

• Purchase from New England Arbors, www.newenglandarbors.com
• Instructions are included with the kit

OPTION THREE -

If Your Arbor:

• is going to be installed onto pre-existing concrete or wood surface

Consider Using:
5 x 5 Surface Mount Kit

• Purchase from New England Arbors, www.newenglandarbors.com
• Follow instructions included with the kit

1

(Posts have been extended with 5x5 Professional Post Extension Kit)

4

3

33

10

2

50

22

Level

(Measurements shown are inside to inside of posts)

Advertising