STEP FOUR
With a helper insert the assembled arch system unto the
posts and slide post caps down into position.
Install screws into the two pre-drilled holes per posts.
Connect the Arch System
to the Side Panels
1
2
www.newenglandarbors.com
STEP FIVE
Ensure that posts and side panels are level.
Fill around the posts with wet cement within 3” of your
natural elevation.
Complete a final level check both horizontally and vertically.
and backfill the remaining space between concrete and
natural elevation with topsoil.
Fill Excavated Holes
3
4
5
5
1915 Dove St., Port Huron MI USA 48060
Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286
www.newenglandarbors.com
3
Level
1
4
3
5
Level
2
1/
4”