Step four, Connect the arch system to the side panels, Step five – New England Arbors VA84234 User Manual

Page 5: Fill excavated holes

Advertising
background image

STEP FOUR

With a helper insert the assembled arch system unto the
posts and slide post caps down into position.

Install screws into the two pre-drilled holes per posts.

Connect the Arch System

to the Side Panels

1

2

www.newenglandarbors.com

STEP FIVE

Ensure that posts and side panels are level.

Fill around the posts with wet cement within 3” of your
natural elevation.

Complete a final level check both horizontally and vertically.
and backfill the remaining space between concrete and
natural elevation with topsoil.

Fill Excavated Holes

3

4

5

5

1915 Dove St., Port Huron MI USA 48060

Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286

www.newenglandarbors.com

3

Level

1

4

3

5

Level

2

1/

4”

Advertising