New England Arbors VA68218 User Manual

Page 2

Advertising
background image

Using eight of the 2 1/2” screws, fasten the two panels together

through the bracets at each post as shown.

The Mayfair Raised Planter Box

4

Lay down one of the pre-assembled side panel with post down

and insert the two front and back panels as shown.

Note: Make sure the support rail is on the bottom of the panels.

Align and insert the second pre-assembled side panel as shown.

3

2

2

S T E P O N E

1

The Mayfair Raised Planter Box

www.newenglandarbors.com

Continue to lock the panels into place using eight of the 5/8”

screws through the top plates in the posts as shown.

1

Note: support rail

2

4

3

Advertising