New England Arbors VA68218 User Manual

Page 3

Advertising
background image

The Mayfair Raised Planter Box

Layout and arrange the floor boards as shown and insert them

one by one starting with either of the shorter floor board.

The boards will be labelled 1 through 6.

For optimal support, insert the boards perpendicular to the

floor support as shown.

Pressure fit the post caps into place. Push until the caps lock into

place.

3

2

S T E P T W O

Place the floor support onto the support rail as shown.

Note the notches and the orientation of the floor support.

1

www.newenglandarbors.com

3

1

2

1 2

3 4 5 6

Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286

www.newenglandarbors.com

3

Advertising