Preface, Audience, Document organization – Cisco CRS-1 User Manual

Page 5

Advertising
background image

v

Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide

OL-5802-09

Preface

This site planning guide describes how to plan and prepare your site facilities for the installation of a
Cisco CRS Carrier Routing System 8-Slot Line Card Chassis (also referred to in this document as the
“Cisco CRS 8-slot LCC”). The guide provides a brief description of the chassis and its components, and
basic site facilities requirements.

This guide describes all power, cooling, and environmental specifications to consider before ordering
and installing the Cisco CRS 8-slot LCC. This guide also describes site facilities requirements, such as
floor space, weight requirements, receiving and staging, and installation information to help you plan
the site where the routing system will be installed.

Note

The installation of a Cisco CRS 8-slot LCC may require space, floor loading, power, and cooling
modifications to a facility; therefore, you should plan the site well in advance of the scheduled delivery
of the system.

Audience

This guide is for customers who must plan the facilities for the site where the 8-slot LCC is to be
installed. It should be used with Cisco Systems site planning coordinators and site inspections, well in
advance of the delivery of the routing system.

Document Organization

This guide contains the following chapters and appendixes:

Chapter 1, “Cisco CRS Carrier Routing System,”

provides an overview of the routing system and its

main components.

Chapter 2, “Power and Cooling,”

provides an overview of the chassis power and cooling systems,

and describes the power and grounding requirements for the routing system.

Chapter 3, “Technical and Environmental Specifications,”

provides technical and environmental

specifications.

Chapter 4, “Site Planning Considerations,”

describes the site facilities requirements to plan for

before you receive and install the routing system.

Appendix A, “Preliminary Site Survey,”

provides checklists for the site preparation process.

Appendix B, “Product IDs for the Cisco CRS 8-Slot Line Card Chassis,”

provides information about

how to order the Cisco CRS 8-Slot LCC components.

Advertising